Build Time log

TOTAL TIME: 505 hours

  • Empenage (258.70)
    • Vertical Stabilizer                          24 hrs
    • Rudder                                        27.25 hrs
    • Horizontal stab                         51.55 hrs
    • Elevators                                    79.70 hrs
    • Tailcone                                        76.2 hrs
    • Attach.. to be completed
  • Wings (QB)
    • Arrived
  • Fuselage (272.1)
    • Midfuse bulkheads                             19 hrs
    • Midfuse ribs and bottom skin        56.3 hrs
    • Firewall.                                             20.7 hrs
    • Forward fuse, BHDS and skin.     52.7 hrs
    • Chapter 29, midfuse skins             82.5 hrs
    • Chapter 30, step                                 2.8hrs
    • Chapter 31, upper forward fuse     20.1hrs
    • Chapter 32, tailcone attach             15.65 hrs
    • Chapter 33 Baggage floors 4.95hrs